CAUSES AND EFFECTS OF CONSTRUCTION PROJECTS DELAY IN NIGER STATE EDUCATIONAL INSTITUTIONS

  • Project Research
  • 1-5 Chapters
  • Abstract : Available
  • Table of Content: Available
  • Reference Style: APA
  • Recommended for : Student Researchers
  • NGN 5000

Abstract

Economic development in every nation is based on construction projects undertaken through several types of contracts. However, construction industry is suffering from delay phenomenon. The causes and effects of delay in construction projects seem critical and if not handled appropriately, it could result to wastage and underutilization of resources. This has contributed to negative impact on stakeholders in the construction industry. This research aimed to appraise the main causes and effects of delay on tertiary institution construction projects with a view to minimizing its causes and improve project delivery, examine the factors responsible for project delay in educational institution in Niger state. 150 structured questionnaires were used and distributed to the following professionals in the construction industry: (Architect, Quantity surveyor, Project manager, contractor and civil engineer) and 135 were retrieved for computation of the result and discussion. Analytical techniques such as mean, ranking, correlation, t-test and analysis of variance (ANOVA), were used to analyze the data. The result showed that insufficient funding, non-payment of completed works, cash flow problem during construction and interference with project performance are the major factors that causes delay in educational institutions construction project. The mitigation measures in their order of importance are: use of appropriate construction method, systematic control mechanisms, proper emphasis on the past experience and developing human resources in the construction industry. The research also concluded that the major effects of construction delay are abandonment of the building projects, adequate planning, variation of project scope, incompetent project manager and delay in progress payment by the clients. Furthermore, the research also concluded, that there is a positive relationship between client related factor and all other related factors that causes delays. However, the research recommended that appropriate construction method and systematic control mechanism should be used appropriately for effective management of construction project in addition, an effective strategies management approach should be adopted at the top management of construction industry. through proper planning and scheduling




FIND OTHER RELATED TOPICS


Related Project Materials

INTERNAL CONTROL SYSTEM IN GOVERNMENT PARASTATALS

Abstract

This study is examines the part played by internal control system in the management of Nigerian parastatals. I...

Read more
ROLE OF TERTIARY INSTITUTIONS IN PROMOTING ENTREPRENEURSHIP EDUCATION IN NIGERIA

ABSTRACT

The impact of globalization on the education system is overwhelming as it has greatly affected not only the cur...

Read more
THE EFFECT OF INFLATION AND INTEREST RATE ON AGRICULTURAL PRODUCTIVITY IN NIGERIA FROM 2000-2015

Abstract

This study is on the effect of inflation and interest rate on agricultural productivity in Nigeria. The total p...

Read more
An Evaluation of the Role of Peer Training in Improving Workplace Safety Culture in Nasarawa State

Background of the Study

Workplace safety culture refers to the shared beliefs, attitudes, and practices that influence safety behavior wi...

Read more
An Assessment of Tax Incentives on Small-Scale Businesses in Jos North Local Government Area, Plateau State

Background of the Study

Tax incentives are policies or benefits offered by governments to encourage inv...

Read more
ATTITUDE OF MOTHERS TOWARDS IMMUNIZATION IN IKPOBA-OKHA LOCAL GOVERNMENT AREA OF EDO STATE

ABSTRACT

This study is attempted to provide a general information and knowledge about the attitude of mothers toward...

Read more
The role of urban planning in mitigating environmental health hazards in Borno State

Background of the Study
Urban planning plays a pivotal role in shaping the health and well-being of commu...

Read more
ASSESSMENT OF THE LEVELS OF COVID-19 PANDEMIC PROTOCOL COMPLIANCE IN SENIOR SECONDARY SCHOOLS IN KANO

​​​​​​​BACKGROUND OF THE STUDY

Coronavirus (Covid-19) is an infectiou...

Read more
An Investigation of Nurses' Preparedness for Handling Cases of Sexual and Gender-Based Violence at Federal Medical Centre, Makurdi

Background of the Study
Sexual and gender-based violence (SGBV) is a significant global public health issue with widespread...

Read more
TEACHER PREPARATION, PROFESSIONAL DEVELOPMENT AND STUDENTS’ ACADEMIC PERFORMANCE IN SOME SELECTED SECONDARY SCHOOLS IN EDUCATIONAL DISTRICT

ABSTRACT

The study attempted to examine the relationship between teacher preparation, professional development and stude...

Read more
Share this page with your friends




whatsapp