Abstract
Economic development in every nation is based on construction projects undertaken through several types of contracts. However, construction industry is suffering from delay phenomenon. The causes and effects of delay in construction projects seem critical and if not handled appropriately, it could result to wastage and underutilization of resources. This has contributed to negative impact on stakeholders in the construction industry. This research aimed to appraise the main causes and effects of delay on tertiary institution construction projects with a view to minimizing its causes and improve project delivery, examine the factors responsible for project delay in educational institution in Niger state. 150 structured questionnaires were used and distributed to the following professionals in the construction industry: (Architect, Quantity surveyor, Project manager, contractor and civil engineer) and 135 were retrieved for computation of the result and discussion. Analytical techniques such as mean, ranking, correlation, t-test and analysis of variance (ANOVA), were used to analyze the data. The result showed that insufficient funding, non-payment of completed works, cash flow problem during construction and interference with project performance are the major factors that causes delay in educational institutions construction project. The mitigation measures in their order of importance are: use of appropriate construction method, systematic control mechanisms, proper emphasis on the past experience and developing human resources in the construction industry. The research also concluded that the major effects of construction delay are abandonment of the building projects, adequate planning, variation of project scope, incompetent project manager and delay in progress payment by the clients. Furthermore, the research also concluded, that there is a positive relationship between client related factor and all other related factors that causes delays. However, the research recommended that appropriate construction method and systematic control mechanism should be used appropriately for effective management of construction project in addition, an effective strategies management approach should be adopted at the top management of construction industry. through proper planning and scheduling
ABSTRACT
This study seeks to examine the effect of doctor-nurse relationship on patient care in Federal...
ABSTRACT
The right of divorce (talaq) is vested in the husband by Islamic law to terminate a marriage that fails to achieve its objective...
BACKGROUND OF THE STUDY
The purpose of food safety is to avoid food poisoning, often known as the transmission of illne...
ABSTRACT
This study is an attempt to investigate the effect of teacher-student ratio on student’s...
ABSTRACT
The major sources of the total foreign exchange accruing to out country comes form oil Beanies which everyo...
BACKGROUND OF THE BODY
Privatization Appeared on standard dictionaries only in the early 1980s [it app...
ABSTRACT
The ethyl acetate soluble fraction of ethanol extract of leaves of Globimetula braunii, a plant used in ethnomedicine for the tr...
STATEMENT OF THE PROBLEM
As more payment systems have been introduced, pundits have been predicting the emergence of a &...
ABSTRACT
Acquisition of real property in Nigeria is a right enshrined under the constitution of Nigeria 1999 (as amended). Transaction in...